Thanks for the validation.
As for that last comment: If there were modifications to the servicing branch (e.g. Emergency Hotfix) it would make sense to RI from Servicing to Main. In the example (Figure 3) this is done on the hotfix r1 sp1 branch. I don't follow what you mean by "Wouldn't that branch also bring version 2 changes down?".
I was simply trying to understand why the diagram includes and FI from Main to Servicing. I was speculating that perhaps they meant for it to be an RI which is at least defensible.
Thanks again.
As for that last comment: If there were modifications to the servicing branch (e.g. Emergency Hotfix) it would make sense to RI from Servicing to Main. In the example (Figure 3) this is done on the hotfix r1 sp1 branch. I don't follow what you mean by "Wouldn't that branch also bring version 2 changes down?".
I was simply trying to understand why the diagram includes and FI from Main to Servicing. I was speculating that perhaps they meant for it to be an RI which is at least defensible.
Thanks again.